Design System · UX · Product Owner · Prototyping · Information Architecture · Repositioning
Repositioning

IOTA was going through a significant repositioning, moving from a research-driven perception towards a clearer product and technology focus. I worked on the website redesign and helped translate this shift into a new information architecture, content structure and product-focused experience for developers and builders.

A key part of the work was creating a shared foundation across three IOTA websites. I contributed to a multi-brand design system and shared web component library that allowed the sites to maintain their individual identities while sharing the same underlying structure and technology.

Working with domain experts, I helped turn complex technical information into a clearer product suite and more accessible content. The result was a website ecosystem that made IOTA’s technology, products and applications easier to understand and explore.

Credit: UI & Graphics: Aleksa Krstic, Motion: Igor R Nilsen, Art Direction: Sabri Goldberg

Rebased, in forty seconds

The launch film for the network upgrade, built from the same visual language as the site.

A site rebuilt around products

IOTA was read as a research project. The revamp put the technology, the products and the people building with them at the front, and the structure followed from that.

Many pages of the redesigned IOTA website arranged at an angle, from the home page to staking and product pages
The IOTA Gas Station product page beside a diagram of how a builder integrates it into a dApp

Every product answers a question

Each product page starts from the problem it solves for a builder, then shows how it works. Written with the domain experts, drawn so a newcomer can follow it.

One language, three brands

A shared design system and component library carry three IOTA sites. Each keeps its own theme and illustration style on top of the same foundation.

Illustration set for the site, with dashboards, a wallet, a fingerprint and a payment card in the blue brand style
The staking calculator, with sliders for amount, rate and time and a projection of the rewards earned

Tools instead of claims

Rather than describe staking rewards, the page lets you move three sliders and see the number. A calculator answers the question the copy was trying to.

A stack made legible

The hardest part was the map. Which pieces exist, what each one is for, and in what order to meet them. This page is that map.

The integration stack page, showing the mainnet and EVM layers above identity, tokenization, wallets and tooling
The new home page, with the headline "We Build Cutting-Edge Technology" and the "What is IOTA?" section below it

The front door

One sentence on what IOTA is, in plain words, above the fold. The old site took several screens to get there.

The "Why Build on IOTA?" page for developers, with capability cards on a dark background

Written for builders

The developer path has its own tone and its own dark theme. Same system underneath, a different audience on top.